Week of January 30,2006

The joists for the second floor were put in and the shething for the second floor was installed allowing for the second floor walls to be built. The large beams for the front porch were also started.

Mrs. Smith and Wynne graciously provided lunch for us one day this week.

Mr. Dew came out and provided the materials and labor and fixed the outlets on our solar powered construction container.

This picture above shows us after we set and nailed down the first sheet of the second floor which is always a good feeling.


Here we are at the end of the day with the second floor sheathing installed. Behind and to the left you'll see a piece of sheathing that looks like it is too long and that's correct. Sometimes, we will just run our sheathing long and cut it off in a straight line when we are finished.